Powerboards¶
XX YY¶
Allocation of the powerboard 'XX'YY' scheme is shown in table 1.
Powerboard | Barrel/Endcap | XX | YY |
---|---|---|---|
Long Strip | Barrel | SB | P0 |
Short Strip | Barrel | SB | P0 |
R0 | Endcap | SE | P0 |
R1 | Endcap | SE | P1 |
R2 | Endcap | SE | P2 |
R3 | Endcap | SE | P3 |
R4 | Endcap | SE | P4 |
R5 | Endcap | SE | P5 |
Table 1: 'XX YY' allocation for Powerboards
FNNNNNN¶
This section needs input from experts
The first digit "F" will be used in the case of powerboard vendors and revisions for barrel and endcap (Table 2)
Vendor/Version | F |
---|---|
Vendor 1 | 0 |
Vendor 2 | 1 |
Vendor 1 (Rev2) | 2 |
Table 2 'F' allocation for Powerboards
PowerBoard Examples¶
-
Long Strip Module Powerboard : 20USBP00324301
-
R3 Module Powerboard : 20USEP31435067